Kitchen & Bathroom Renovation London
Complete kitchen and bathroom renovation across London. Crestane can coordinate strip-out, plumbing, electrical works, plastering, tiling, flooring, carpentry, installation and final decoration as one managed refurbishment package.
Request a Renovation Quote Explore Our ServicesPlanning a new kitchen or bathroom in London?
Tell us about the property, rooms involved and what you want replaced or changed. Crestane can undertake the renovation as an individual project or incorporate it into a larger property refurbishment.
One contractor across the whole installation
Kitchens and bathrooms usually require more than one trade. The surrounding services, walls, floors and finishes need to work together with the final installation.
Request a renovation quote
Provide the main project information below.
Renovation involves much more than fitting the final units
Kitchens and bathrooms are among the most construction-intensive rooms in a property because several trades often need to work within a relatively small area.
Removing the existing installation can expose walls, floors, plumbing and electrical services that need to be altered or prepared before the new layout can be completed.
Crestane Construction provides kitchen and bathroom renovation across London, coordinating the relevant strip-out, plumbing, electrical, plastering, tiling, flooring, carpentry and installation works.
The project can involve one kitchen or bathroom, several rooms or form part of a complete house refurbishment or extension.
From existing room to completed renovation
The exact scope depends on the property and new design, but Crestane can coordinate the main construction and finishing packages required around the installation.
Kitchen Renovation
Complete kitchen renewal including preparation, services, installation, flooring, tiling and finishes.
Bathroom Renovation
Complete bathroom refurbishment including strip-out, plumbing, preparation, tiling and installation.
Existing Strip-Out
Removal of existing units, sanitaryware and agreed finishes before the new installation begins.
Plumbing
Plumbing alterations and installation coordinated with the proposed kitchen or bathroom layout.
Electrical Works
Relevant lighting, power and electrical alteration forming part of the renovation.
Plastering & Preparation
Repair and preparation of walls and ceilings before final finishes and installation.
Tiling
Wall and floor tiling incorporated into kitchen and bathroom renovation projects.
Flooring
Preparation and suitable floor finishes coordinated with the new room installation.
Carpentry & Finishing
Associated carpentry, trims, making good and final finishing required around the completed room.
Rebuild the kitchen around how the property needs to work
A kitchen renovation may involve replacing an existing layout like-for-like, but many projects go further by moving appliances, altering plumbing, adding lighting or changing the relationship between the kitchen and surrounding rooms.
The work can include removal of the old kitchen, services alterations, plastering, wall preparation, flooring, tiling, cabinetry installation, worktop-related preparation and final decorating.
Where the kitchen forms part of a new extension or open-plan structural alteration, Crestane can coordinate these larger construction works with the final kitchen installation.
Coordinate plumbing, surfaces and installation properly
Bathroom renovation requires careful coordination because plumbing, electrical works, wall construction, floor preparation, tiling and final fixtures all occupy the same relatively small space.
The work can involve removing the old bathroom, altering the layout, preparing walls and floors, changing pipework, completing suitable electrical works, tiling and installing the new sanitaryware and finishes.
Bathrooms can be renovated individually or several bathrooms and en-suites can be incorporated into a larger property renovation.
The order of work matters
Kitchens and bathrooms involve several trades that depend on each other.
Plumbing and electrical positions need to relate to the proposed installation. Walls and floors need to be prepared before final tiling and cabinetry. Final decoration should follow the disruptive construction work rather than precede it.
Coordinating these activities as one project helps create a logical route from existing room to completed installation.
What can be included?
Remove agreed existing kitchen units, worktops and finishes.
Remove existing sanitaryware and agreed bathroom finishes.
Coordinate pipework with the proposed new room layout.
Coordinate relevant electrical works with new fixtures and layouts.
Plastering and making good before final surfaces are installed.
Prepare suitable floors before tiling or other finishes.
Coordinate cabinetry and associated installation works.
Install suitable sanitaryware and associated fittings.
Suitable tiled finishes around kitchen and bathroom areas.
Complete suitable flooring around the finished installation.
Complete associated trims, doors and internal timber works.
Complete surrounding surfaces and final decoration.
The kitchen or bathroom may only be one part of the project
Many London renovation projects involve the kitchen and bathrooms alongside wider work throughout the property.
This can include strip-out, structural alterations, electrical upgrades, plumbing, plastering, flooring, carpentry and decorating across several rooms.
Crestane can therefore incorporate kitchens and bathrooms into a complete refurbishment programme rather than limiting the project to the individual room.
For larger projects, see our House Refurbishment London service.
Combine a new kitchen with a larger ground-floor extension
A common extension objective is to create a larger kitchen, dining and living area at the rear of an existing house.
These projects can involve foundations, new external construction, structural openings, steelwork, glazing and building services before the kitchen installation begins.
Crestane can coordinate the construction and interior elements so the extension and new kitchen form part of the same project.
See our House Extensions London page for wider extension work.
What affects renovation cost?
Cost depends on the existing room, new layout, amount of services work and specification of the final installation.
From existing room to finished installation
Review
Understand the existing room, proposed layout, fixtures and wider project requirements.
Strip Out
Remove the agreed existing installation and prepare the room for the new work.
Services
Complete required plumbing and electrical alterations for the proposed layout.
Prepare Surfaces
Repair and prepare walls, ceilings and floors for installation and final finishes.
Install
Progress cabinetry, sanitaryware, tiling, flooring and associated works.
Complete
Finish the room, make good surrounding areas and complete the agreed scope.
Renovation across different London properties
What should you send with your enquiry?
Property Address
Provide the property postcode and basic property type.
Existing Photos
Photos can quickly show the current kitchen or bathroom condition.
Proposed Layout
Send drawings or describe how you would like the new room arranged.
Fixtures & Finishes
Tell us what products or finish styles you are considering.
Services Changes
Mention whether sinks, appliances, baths or showers are moving.
Wider Works
Tell us if the renovation forms part of an extension or whole-property refurbishment.
Kitchens and bathrooms often connect with wider construction
Kitchen and bathroom renovation across Greater London
Crestane considers suitable kitchen, bathroom and wider refurbishment projects throughout Greater London.
Frequently asked questions
Does Crestane undertake complete kitchen renovation?
Yes. Suitable kitchen projects can include strip-out, plumbing and electrical alterations, preparation, installation, tiling, flooring, carpentry and decoration.
Does Crestane undertake complete bathroom renovation?
Yes. Bathroom projects can include removal of the existing installation, plumbing, electrical work, wall and floor preparation, tiling, sanitaryware installation and finishing.
Can Crestane undertake both the kitchen and bathroom?
Yes. Several rooms can be coordinated within the same refurbishment programme.
Can plumbing be moved?
Plumbing alterations can be incorporated where required by the proposed kitchen or bathroom layout.
Can electrical works be included?
Relevant electrical works can be coordinated with the renovation and new room layout.
Do you undertake tiling?
Yes. Wall and floor tiling can form part of suitable kitchen and bathroom renovation projects.
Can you do the plastering and flooring too?
Yes. Plastering, preparation and flooring can be included where required as part of the overall renovation.
Can you renovate my kitchen as part of an extension?
Yes. Crestane can coordinate kitchen installation with suitable extension construction and wider ground-floor works.
Can kitchens and bathrooms form part of a whole-house refurbishment?
Yes. Kitchens and bathrooms are commonly incorporated into larger property refurbishment projects involving multiple trades.
Can you remove the old kitchen or bathroom first?
Yes. Relevant strip-out can be included before the new installation.
Can you change the layout?
Layout changes can be considered depending on the property, services and construction required.
How much does kitchen renovation cost in London?
Cost depends on room size, existing condition, layout changes, plumbing and electrical work, cabinetry, worktops, flooring, tiling and the specification of the final kitchen.
How much does bathroom renovation cost in London?
Cost depends on room size, strip-out, plumbing changes, sanitaryware specification, tiling, electrical work, preparation and final finishes.
Do I need everything selected before making an enquiry?
No. You can contact Crestane before the final specification is confirmed. Existing photographs and a description of what you want to achieve are useful starting points.
Which areas of London does Crestane cover?
Suitable kitchen and bathroom renovation projects can be considered throughout Greater London including Central, North, North West, West, South West, South, South East and East London.